OracleMan بتاريخ: 4 يناير 2005 تقديم بلاغ مشاركة بتاريخ: 4 يناير 2005 Project Summary In our study for this project, we have used a produced energy form silent electric which had generated round to transmission lines; it was considered as a wasted energy. We haven’t benefited form it, whatever we can convert it to electric energy that we can use it.From the healthy environment side there is no any environment crisis. This study rely on principle of the الكهروستاتيكي urging on the environment which is reverse to electric stations that will effect direct or indirect to the environment by issues some ضوضائي و هوائي pollution, but from the beautiful side we have considered to design the electric cycle to doesn’t effect on the environment appearance. By implemented this project we will get social feedback in some areas and drains settlement, so the consumers in that areas can build some of social and services centers.The summarized recommendations from this study are the following:-o Safety Distances for transmission lines which estimated about 500M form both two sides.o Prevent to build houses or farms with circumference less than that distances, because it will have negative effect on human body...etc It had determined demand capabilities for some areas (max. demand) to make simple statistics about those areas, their needs to electricity with assistance from some engineers from in/out Electricity Company.Fifth chapterIn this chapter, we have proved the needs of this project from economic side and its competence to build new stations. From reliability side, this study relies on the competence of transmission lines which have a high affect rather than generated station. اقتباس رابط هذا التعليق شارك المزيد من خيارات المشاركة
Recommended Posts
انضم إلى المناقشة
يمكنك المشاركة الآن والتسجيل لاحقاً. إذا كان لديك حساب, سجل دخولك الآن لتقوم بالمشاركة من خلال حسابك.